Headgates
WRVID #45 would like to thank Nick Purdy and his amazing crew for helping us with repairs to our head gate. Mr. Purdy provided the materials at cost and donated much of the labor for this project. All of the old wood was removed from the head gates and replaced with steel beams. The cat walk was replaced and a nice (and much safer) hand rail was installed. Below are before and after shots of the head gate project.